Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Scheduling multiple jobs at the same time
#1
Hi Wila,
I have dabbled in the past with Vimalin, but never really went through.
After a crash (I did have a normal backup in place ;-)), I want to have a daily Vimalin backup of some of my VM.

I am planning to do the backups around 2:00 AM and connected this schedule to 2 jobs for now.

Will Vimalin execute the jobs at the same time or wait for the first one to end ?
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)